Brighton Oasis Family Aquatic Park
Working alongside a local architect, WTI was hired to complete the final design, assist with the construction and bid documents and provide construction administration services for the Brighton Oasis Family Aquatic Park. WTI's Doug Whiteaker worked closely with the park and recreation staff in the creation of the previously established concept plan when he was with a different firm. Therefore, our understanding of the project is unique; we are very familiar with the original design intent and the history behind the decisions that were made during the phase I development in 2003. The aquatic facility was constructed in three phases, including the leisure pool phase and the lazy river phase. The final phase will be an indoor competitive pool. The project was intended to be designed and constructed to achieve LEED Silver certification.
Project Highlights
- An initial public meeting was held to gather input from the community, which was used in conjunction with the design committee to develop schematic designs.
- Pool amenities